Technology · SOP adherence platform · Manufacturing · Mumbai

Two months from build to first live SOP.

100 Ops began with a problem on a factory floor: nobody could see whether work was happening, step by step and on time. No tool answered it the way a factory needed, so we built one.
Product 100 Ops by DeboxFirst live at Zenith Rubber, DombivliBuilt From July 2026Status Live and growing
Build start to first live SOP2 monthsBuild began August 2026; the first SOP went live in October.
New SOPs going live~2 a weekEach through build, test, demo, feedback and rollout.
Every step carriesOwner · deadline · proofWith turnaround time per step, service level per process and early escalation.
01

The short version

100 Ops is Debox’s platform for running SOPs as live workflows. Every step gets an owner, a deadline and proof, and anything running late is flagged while there is still time to act.

It was never planned in a product meeting. It grew out of client work. At Zenith Rubber, a performance review project stalled because nobody could see whether work was being done, step by step and on time. We rebuilt the SOPs to fix the process, and then met the question every business eventually asks: once the process is written down, how do you know it is followed?

No tool answered that the way a factory needed, so in July 2026 we decided to build one. The build started in August and the first SOP went live at Zenith’s Dombivli factory in October. New SOPs now go live at about two a week.

02

It began with a question

Most growing businesses share the same blind spot. Their SOPs live in documents. Their ERP records transactions — an order, a receipt, an invoice. But the work in between, the checks, approvals and hand-offs that decide whether a transaction goes right, sits in neither place in a form anyone can follow.

That blind spot is expensive even though it never shows up as a line item. A quotation waits days because a hand-off has no owner. The same mistake returns every quarter because the fix never became anyone’s step. And the real way the business runs lives in two or three people’s heads.

We saw all of it up close. Performance reviews had paused because the data behind them did not exist, and the SOPs we were rebuilding kept running into the same wall. The tools we looked at either stored an SOP as a document or tracked a task’s start and end. None followed every step and milestone in between, each with its own deadline, and raised a flag before the delay landed.

Late news is history. Early warning is management.

03

Two months from idea to live

100 Ops was shaped inside a working factory rather than a lab, so every feature answered a question a real team was already asking.

Jul
The idea. The SOP discussions turned into a data tracking discussion, and the decision to build.
Aug
The build. Design and build began, shaped around real quality processes on the shop floor.
Oct
First SOP live. Customer complaints went live at the Dombivli factory, two months after the build began.
Now
About two a week. New SOPs go live in a steady rhythm.

The pace comes from a simple, repeatable cycle. Each SOP is built on the platform, tested on real transactions, demoed to the team that will run it, refined from their feedback and rolled out. A new SOP moves from paper to live in days, and a new business can have its first function live in four to six weeks.

04

What 100 Ops does

It turns each SOP into a live workflow. It does not stop at when a process started and ended; it follows every step and milestone in between.

01
Every step owned. A named person accountable, and a deadline that starts the moment the step opens.
02
Turnaround and service levels inside every SOP. Time tracked for each step and for the whole process, so you can see exactly where it goes.
03
Early escalation. A step near its deadline sends a reminder. If it still slips it escalates up the reporting line on its own, with the full history attached.
04
Proof, not ticks. A step closes against something real — a photo with time and location, a document, a figure from the ERP, or a system event.
05
Today’s list, ready every morning. Each night the platform reads what was completed and what slipped, then sends each person their steps for the day.
06
Made for the shop floor. A mobile app for Android and iOS, in nine languages, that works without signal and syncs later.
07
Functions first, people later. Adherence is scored by process, department and site, so it starts as a management tool rather than a policing one.
08
Works with your ERP. Connects to systems such as SAP, Microsoft Dynamics and Tally. The ERP keeps recording transactions; 100 Ops records whether the work behind them was done.

Where AI fits. Once every step carries proof, there is a great deal of it to check. Optional AI can review the proof and flag what looks wrong, draft a first version of an SOP from an existing document, spot quiet patterns such as steps that slip at month end, draft root-cause notes, and answer plain-language questions about performance. It is switched on only when a business wants it, and can run on the business’s own model.

Your ERP records the transaction. 100 Ops proves the work behind it.

05

The pilot

The pilot ran at Zenith Rubber’s Dombivli factory — a family-owned industrial rubber manufacturer with a 300-plus workforce running Microsoft Business Central. It was the right place to start for three reasons: the need was real, the SOPs were already being rebuilt, and the processes were complex enough to test the platform properly.

What was not working. Quality check data was hard to track in Business Central, and so were holds and dispositions on material. Customer complaints moved between people without a clear owner at each stage, so a complaint could sit unnoticed until a customer chased it. And because none of it was recorded step by step, the performance reviews had nothing reliable to measure.

How it rolled out. Customer complaints first — every complaint from first report to closure, with an owner and a deadline at each stage and an escalation if a stage runs late. Quality checks next, each with an owner and a deadline and its result recorded against the step rather than in a separate register. Then holds and dispositions, tracked to closure rather than left in the ERP where they were hard to follow. Once every Quality SOP was live, EXIM and Purchase followed. Production Planning is next.

Zenith kept Business Central. It still records the transactions; 100 Ops runs the steps that were long or awkward there.

MeasureResultBasis
Build start to first live SOP2 monthsAugust to October 2026.
Go-live pace~2 a weekEach through build, test, demo, feedback and rollout.
Functions live3Quality, EXIM and Purchase. Every Quality SOP live; Production Planning next.
Processes moved off the ERP3Quality checks, holds and dispositions, now tracked step by step.
TargetMarch 2027Every possible SOP live at the Dombivli factory.

How to read this

It is early, on purpose. These figures show how fast 100 Ops was built and adopted. They do not yet show what it changes. What comes next is fewer deadline breaches, fewer issues reaching senior management, and function heads who can answer a question about last week without asking anyone — and none of that is measurable yet.

One site, one client. Everything above comes from a single pilot at a single factory. It is enough to say the platform works in a demanding environment. It is not enough to generalise.

06

Built for every business that runs on process

The pilot was the first fit, not the only one. If your business runs on repeatable work done by more than a few people, the pattern fits: steps, owners, deadlines and hand-offs between teams. The industry matters less than the pattern.

01
Manufacturing. Quality checks, holds, dispatch clearance, maintenance, customer complaints.
02
Distribution and retail. Order to delivery, store opening and closing checks, returns, credit approvals.
03
Logistics. Pick-up to proof of delivery, vehicle placement, claims.
04
Healthcare and pharma. Patient intake, equipment checks, compliance records.
05
Hospitality and restaurants. Opening checklists, food safety, kitchen hygiene, guest complaints.
06
Construction and real estate. Site inspections, material approvals, snag lists, handovers.
07
Services and back offices. Client onboarding, approvals, month-end close, hiring and onboarding.
08
Multi-site businesses. The same process run the same way at every plant, branch or outlet, and compared fairly.

What it needs from you. One senior internal owner, named up front. About four hours a month of leadership time for the first three months, then about two. And a start of two or three functions, adding the rest once people are using it.

If your SOPs areFirst function live inWhat happens
Already working and trusted4–6 weeksWe onboard your processes with ready templates for your functions.
In people’s heads, or out of date10–14 weeksOur consultants review and correct the SOPs first, then build and take them live.
Live and growingdays per SOPEach new SOP through build, test, demo, feedback and rollout. The pilot adds about two a week.

If a process has a trigger, a set of steps and a finish, it can run on 100 Ops.

07

What we now build in from day one

Fix the process before the platform. Putting a broken process on a system only shows the breakage faster. That is why 100 Ops at Zenith followed the SOP rebuild, and why every rollout starts by checking the process is right.

Proof over ticks. A step closes on evidence, not a tap. Clean data about real work is worth more than tidy data about nothing.

Functions first, people later. Scoring starts with departments and processes. Individual scoring is a choice a business makes later, openly, once the system is trusted.

One internal owner, named up front. Every rollout needs a senior person inside the business who owns it. It is the strongest single predictor that the system will still be in use a year later.

Start small, then grow. Two or three functions first, then the rest once people are using it. Our first factory started with one SOP and now adds about two a week.

If your SOPs live in a folder

They describe what is supposed to happen. Nothing in the folder tells you whether it happened today, who it waited on, or how long it sat there — and your ERP will not tell you either, because it records transactions rather than the work between them.

That gap is where orders go quiet, where the same mistake returns each quarter, and where the real way a business runs ends up living in two or three people’s heads.

Measurement note. Build timeline, go-live pace, functions live and rollout approach are from our own project records and the pilot at Zenith Rubber’s Dombivli factory. Figures on this page describe how quickly the platform was built and adopted, not what it has changed; adherence and performance outcomes become measurable once enough SOPs have run long enough to compare. Implementation timeframes are based on the pilot and on scoped onboarding plans.